Monday, August 18, 2008

Stone Work on Building

WOW! I was away for a week, and I came back to see the stone work being applied to the front of the building and the retaining wall going in around the front turnaround. It all looks great! Inside, the sprinkler system is going in, the duct work now hangs down to where blowers will appear in the ceiling; and the electrical work is well underway.
See pics at: http://www.briarcliffmanorlibrary.org/photos.html

No comments: