Thursday, December 13, 2007

Library Plumbing back on line!

The Library, although still a bit of a hassle to get into, now has both heat and plumbing. The news of the week is that the parking lot has another layer of gravel and the DPW will clear snow from the lot, walkways, and stairs to the Library after the streets are cleared. Next week the concrete slab will be poured and the foundation will be backfilled as the site is graded to its normal appearance.